a 5/8 doublebraid was preinstalled into the steel block. using throwlines the 5/8 was tied off to the near top of one of the dead stems. a closeup of the block and rope is shown in the second photo of this series.
Thursday, November 13, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment