Pages

Thursday, November 13, 2008

the first part was to install a large steel rigging block attached to a 3/4" doublebraid rope tied off to a port-a-wrap at the base of the tree. all the rigging was installed from the ground using throw lines. the double braid was threaded thru 2 crotches about 75' up in the larger live tulip. 2 crotches to distribute the load between two stems.

No comments: